Monday, July 28, 2008

Sound booth is being built at the back of the Nave.




Siding continues to be put on the outside of the church. This is a 'cement' siding and should be more durable than standard vinyl or aluminum siding! It's certainly longer lasting than the old clapboard.



Interior of the church. Taping and mudding have been completed and painting will begin very soon. The hope is that the chancel and sanctuary raised dias will be built this week also.








Wednesday, July 23, 2008





From the top, first is the interior looking towards the front of the church, second is the interior looking towards the back of the church, third is a look at the siding being put on the outside of the church and finally last is the current exterior view.

Tuesday, July 22, 2008

Heat pumps on back of the church. Four heat pumps will give us four heating zones.
Back of the church before wallboard goes up.
Electrical Room in the new church. I'm just glad that I don't have to figure out which wire should be connected to which breaker!!

Window frame from old church relocated to new.